Cisco Firepower 4100 Series Manual - Halaman 6

Jelajahi secara online atau unduh pdf Manual untuk Perangkat Keras Jaringan Cisco Firepower 4100 Series. Cisco Firepower 4100 Series 8 halaman. Rack-mount and ground the chassis
Juga untuk Cisco Firepower 4100 Series: Panduan Produk (17 halaman), Manual (8 halaman), Panduan Pemeliharaan dan Peningkatan (20 halaman), Manual (36 halaman), Manual (42 halaman), Manual (38 halaman)

Cisco Firepower 4100 Series Manual

Ground the Chassis

Figure 4: Inner Rail Release Clip
1
Inner rail release clip
Outer rail attached to rack post
3
Step 6
Use the captive screws on the front of the mounting brackets to fully secure the chassis to the rack.
What to do next
Ground the chassis. See
Install the FIPS opacity shield if necessary. See
Install the cables according to your software configuration as described in the
Started
Ground the Chassis
Note
Grounding the chassis is required, even if the rack is already grounded. A grounding pad with two threaded
M4 holes is provided on the chassis for attaching a grounding lug. The grounding lug must be Nationally
Recognized Testing Laboratory (NRTL)-listed. In addition, a copper conductor (wires) must be used and the
copper conductor must comply with National Electrical Code (NEC) code for ampacity.
Rack-Mount and Ground the Chassis
6
Ground the Chassis, on page 6
Guide.
2
Inner rail attached to chassis
for the procedure.
Install the FIPS Opacity Shield
Rack-Mount and Ground the Chassis
for the procedure.
Cisco Firepower 4100 Getting