Cisco UCS B200 M3 Catatan Instalasi dan Layanan - Halaman 15
Jelajahi secara online atau unduh pdf Catatan Instalasi dan Layanan untuk Perangkat Keras Jaringan Cisco UCS B200 M3. Cisco UCS B200 M3 28 halaman. Blade server
Juga untuk Cisco UCS B200 M3: Panduan Instalasi (34 halaman), Catatan Instalasi dan Layanan (36 halaman), Catatan Instalasi dan Layanan (37 halaman), Manual (8 halaman), Panduan Peningkatan (21 halaman)
Figure 11: Proper Alignment of CPU Pick-and-Place Tool
1
Installing a New CPU and Heat Sink
Before installing a new CPU in a server, verify the following:
• The CPU is supported for that given server model. Refer to the Specification Sheet for this server to see the list of supported
CPUs. The Specification Sheets are available at this URL:
http://www.cisco.com/c/en/us/products/servers-unified-computing/ucs-b-series-blade-servers/datasheet-listing.html
• A BIOS update is available and installed that supports the CPU and the given server configuration.
• If the server will be managed by Cisco UCS Manager, the service profile for this server in Cisco UCS Manager will recognize
and allow the new CPU.
Caution
The Pick-and-Place tools used in this procedure are required to prevent damage to the contact pins between the motherboard
and the CPU. Do not attempt this procedure without the required tools. If you do not have the tool, you can order a spare.
• UCS-CPU-EP-PNP=; Pick n place CPU tools for M3/EP 10/8/6/4/2 core CPUs (Green)
• UCS-CPU-EP2-PNP=; Pick n place CPU tools for M3/EP v2 12 core CPUs (Purple)
Procedure
Alignment mark on the
button/handle of the
Pick-and-Place tool
2
Alignment mark on the
socket
15