Cisco 7513 Series Panduan Memulai Cepat - Halaman 12

Jelajahi secara online atau unduh pdf Panduan Memulai Cepat untuk Server Cisco 7513 Series. Cisco 7513 Series 44 halaman. Chassis replacement
Juga untuk Cisco 7513 Series: Manual Petunjuk Penggantian (26 halaman), Lembar data (11 halaman), Manual (30 halaman), Mempertahankan (20 halaman), Manual Petunjuk Penggantian (19 halaman), Manual Petunjuk Penggantian (22 halaman)

Cisco 7513 Series Panduan Memulai Cepat
Install the Hardware
Attach the Cable-Management Bracket
10
Step 1
Locate the two slotted screws between the
blower module and the card cage opening
at the interface processor end of the
router.
Step 2
Use a flat-blade screwdriver to loosen the
screws.
Step 3
Place the bracket over the screws.
Step 4
Tighten the screws.
Step 5
Route the cables to and through the
cable-management bracket.
Blower
module
Loosen
screws (2)
Bracket
Card cage
Note
If you are using very thin cables that slip
through the bracket, insert cable ties through the
holes in the bracket and wrap them around the
cables to secure them.
It may be necessary to bundle longer cables to avoid
tangling them. Do not block the power supply or
chassis intake air vents with cables. Cables should
not interfere with the removal and installation of the
blower module.