Cisco ONS 15454 SDH Manual Prosedur - Halaman 10

Jelajahi secara online atau unduh pdf Manual Prosedur untuk Server Cisco ONS 15454 SDH. Cisco ONS 15454 SDH 22 halaman. Install cards and fiber-optic cable

Cisco ONS 15454 SDH Manual Prosedur
NTP- D17 Install the Electrical Cards
The MRC-12 card requires SFPs and the STM64-XFP cards require XFPs to provide a fiber interface. If
you installed any of these cards, complete the
page 20-28
task on page
NTP-D17 Install the Electrical Cards
During this procedure, wear grounding wrist straps to avoid ESD damage to the card. Do not directly
The E3-12 card can be deployed in a central office or a carrier's exchange.
Note
Note
Install higher-capacity cards first; for example, install an E3-12 card before installing an E1-14 card. Let
each card boot completely before installing the next card.
Cisco recommends installing STM-N, transponder (TXP), and muxponder (MXP) cards before you
Note
install electrical cards, as applicable.
If you installed XC-VXL-10G or XC-VXC-10G cards, review
Open the card latches/ejectors.
Use the latches/ejectors to firmly slide the card along the guide rails until the card plugs into the
Step 3
receptacle at the back of the slot.
Cisco ONS 15454 SDH Procedure Guide, R8.5
2-10
or preprovision the SFP/XFP using the
18-8.
"NTP-D19 Install Fiber-Optic Cables on Optical Cards" procedure on page
This procedure installs the electrical cards (DS3i-N-12, E1-42, E3-12, and
STM1E-12).
Electrical cards
NTP-D220 Install the Power and Signal FMECs, page 1-7
2-21.
Chapter 2 Install Cards and Fiber-Optic Cable
"DLP-D107 Preprovision an SFP or XFP Device"
Table 2-1 on page 2-3
to determine card/slot compatibility.
Table 2-2 on page 2-5
"NTP-D227 Remove and Replace a Card"
2-16.
to determine
78-18118-01