Cisco SCE8000 GBE Panduan Memulai Cepat - Halaman 17
Jelajahi secara online atau unduh pdf Panduan Memulai Cepat untuk Server Cisco SCE8000 GBE. Cisco SCE8000 GBE 25 halaman. 10gbe platform
Juga untuk Cisco SCE8000 GBE: Panduan Konfigurasi (18 halaman), Prosedur Penghapusan dan Penggantian (36 halaman), Menginstal (21 halaman)
Figure 10
Cabling the 10 GBE Interface
S C E 80 00
-S IP
The Link LED should be green.
6
Completing the Installation
This module explains how to verify link connectivity and how to install a Cisco service control application.
Examining the LEDs
• The 10 GBE Link LED should be green. This indicates that an active connection exists.
• The 10 GBE RX and TX LEDs (if flashing green) indicate that traffic is being received or transmitted by the SCE 8000
platform, respectively.
In an inline topology, the RX and TX LEDs indicate that packets are being received and transmitted by the
Note
SCE 8000 platform.
• In optical splitter topologies, the RX LEDs are the sole indicators. The TX LEDs do not blink, because the TX is not
connected to the port in this topology.
Performing Final Installation Verification
Viewing 10-Gigabit Ethernet Port Status
At the Cisco SCE> prompt, type show interface TenGigabitEthernet 3/ baynumber /0.
Step 1
This displays the port link status.
The following example shows how to display a system response.
Cisco SCE8000>show interface TenGigabitEthernet 3/1/0
Actual Status:
Link is on
Bandwidth: 10000000Kbps
Burst-size: 500000bytes
SP A -1 X1
0G E- L- V2
SP A -1 X1
0G E- L- V2
17