Cisco UCS B260 M4 Catatan Instalasi dan Layanan - Halaman 47
Jelajahi secara online atau unduh pdf Catatan Instalasi dan Layanan untuk Server Cisco UCS B260 M4. Cisco UCS B260 M4 50 halaman. Blade server
Juga untuk Cisco UCS B260 M4: Catatan Instalasi dan Layanan (46 halaman)
Upgrading to a Cisco UCS B460 M4 Blade Server
Procedure
Step 1
Open the ejector levers on the front of the UCS Scalability Connector. See callout 1 in the following figure.
Step 2
While holding the ejector levers open, line up the four guide posts with the holes on the bracket and push the
UCS Scalability Connector into place until it engages. See callout 2.
Step 3
Close the ejector levers.
Step 4
Tighten the captive screws on the front of the UCS Scalability Connector. See callout 3.
Step 5
Use Cisco UCS Manager to power on the blade server and reconfigure it.
Figure 23: Installing the UCS Scalability Connector
Cisco UCS B260 M4 and B460 M4 Blade Server Installation and Service Note for Servers with E7 v3 and E7 v2 CPUs
Installing a Scalability Connector
39