fine fixtures TDF2 Panduan Instalasi - Halaman 7
Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Produk Pipa fine fixtures TDF2. fine fixtures TDF2 8 halaman. Fixed full frame shower panel
5
SECURING THE GLASS
Secure the glass in the rail, using
a caulking gun and high-quality
clear silicone caulk.
6
DRYING THE GLASS
Let the glass dry for 24 hours.
Do not touch, move, or make
wet during these hours.
7
AFTER
INSTALLATION
WAIT 24 HRS
BEFORE USE