Argos Home Venetia 792/4543 Manual Petunjuk Perakitan - Halaman 12
Jelajahi secara online atau unduh pdf Manual Petunjuk Perakitan untuk Perabotan Dalam Ruangan Argos Home Venetia 792/4543. Argos Home Venetia 792/4543 20 halaman. Shoe storage
Assembly Instructions
Step 15
Fit the overbalance
protector kits
a:
Before fitting the
overbalance protector
kit, use a spirit level to
check the top of the unit
is level, front-to-back
and side-to-side in the 3
positions shown.
Use suitable packing
pieces (not supplied) to
make the unit level.
To prevent possible
overbalancing this unit
must be secured to a
suitable wall by fitting of
the overbalance
protector kit
to the
L
unit.
b:
Push the unit up
against the wall and fit
the 1st screw through
the bracket and up into
the shallow mark-hole
drilled into the underside
of the top panel.
Slide the bracket against
the wall and fit the 2nd
screw into the underside
of the top panel.
Mark the slot at the back
of the bracket for drilling
into the wall.
Wall fixings are not
supplied as they will
need to suit the wall
type.
Note: Take care when
drilling the wall that you
do not drill into any
pipes, wires etc.
If in doubt, consult an
expert.
11
In order to prevent overturning
this product must be used with the
wall attachment device provided
a:
Note: The 1st screw
uses the shallow
mark-hole drilled
into the underside
of the top panel
b:
Top
Back
Cut-out
in back panel
WARNING!
See the next page for a guide
to wall mounting and fixings
Top
L
Back
L
G
Top
L
L