CRRC MS-BT20 Panduan Instalasi - Halaman 9

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Peralatan CRRC MS-BT20. CRRC MS-BT20 17 halaman. For 1/2” meishan bobtail

3. Operation

3.1 Before Startup

a. Select the correct nose assembly for the specific fastener to be installed.
(See section 3.2 for the steps of nose installation)
b. Turn the hydraulic system to OFF and disconnect the power supply from unit,
then connect the tool hoses to the tool;
c. Connect the tool's control switch electrical cord to the hydraulic unit.
d. Connect the hydraulic unit to the power supply. Turn on the unit. Press the
tool's trigger a few times to circulate the hydraulic fluid. Observe the action
of the tool and check for any leaks.
e. Check the PULL and PUSH pressure, if necessary, adjust to the proper
pressure.

3.2 Assembly of Tool

STEP1: Thread the anvil to the piston.
STEP 2: Thread the jaw into the connecting base through the anvil.

3.3 Standard of Riveting

Standard of installed rivet: completely deformed collar and complete pintail.
Qualified
NOT Qualified
7
NOT Qualified