Aeon Labs AEO_SES3_EU Panduan Memulai Cepat

Jelajahi secara online atau unduh pdf Panduan Memulai Cepat untuk Beralih Aeon Labs AEO_SES3_EU. Aeon Labs AEO_SES3_EU 5 halaman. Inline smart energy switch

AEO_SES3_EU
Inline Smart Energy Switch
Firmware Version: 2.25
Product Series: AEOR
Quick Start
A
This is a Z-Wave actuator.
Inclusion and Exclusion are confirmed by a single click on the button. If the Aeon Labs Inline Smart Energy Switch is not included into any Z-Wave network, the LED will be blinking
continually.The device supports secure communication.
Please refer to the chapters below for detailed information about all aspects of the products usage.
What is Z-Wave?
This device is equipped with wireless communication complying to the Z-Wave standard. Z-Wave is the international standard for wireless communication in smart homes and buildings. It
is using the frequency of 869 MHz to realize a very stable and secure communication. Each message is reconfirmed (two-way communication) and every mains powered node can act as a
repeater for other nodes (meshed network) in case the receiver is not in direct wireless range of the transmitter.
Z-Wave differentiates between Controllers and Slaves. Slaves are either sensors (S) transmitting metered or measured data or actuators (A) capable to execute an action. Controllers are
either static mains powered controllers (C) also referred to as gateways or mobile battery operated remote controls (R). This results in a number of possible communication patterns within a
Z-Wave network that are partly or completely supported by a specific device.
1. Controllers control actuators
2. Actuators report change of status back to controller
3. Sensors report change of status of measured values to controller
4. Sensors directly control actuators
5. Actuators control other actuators
6. Remote controls send signals to static controllers to trigger scenes or other actions
7. Remote controls control other actuators.
There are two different role a controller can have. There is always one single primary controller that is managing the network and including/excluding devices. The
controller may have other functions - like control buttons - as well. All other controllers don't manage the network itself but can control other devices. They are called
secondary controllers. The image also shows that its not possible to operate a sensor just from a remote control. Sensors only communicate with static controllers.
Product description
The Aeon Labs Inline Smart Energy Switch is a Z-Wave light switch specifically used to enable Z- Wave commands and control (on/off) a device that is connected to a standard Schuko Wall
Outlet.
It can also report immediate wattage consumption or kWh energy usage over a period of time. The wireless module is powered from the mains supplys. In the event of power failure, non-
volatile memory retains all programmed information relating to the units operating status. This device support secure communication when included by a controller that also supports
secure communication. The device will then send all commands as secure commands unless the receiving device can not accept them. Then the command is send the normal way
automatically.
Before Device is installed
Please read carefully the enclosed user manual before installation of the radio-actuator, in order to ensure an error-free functioning.
ATTENTION: only authorized technicians under consideration of the country-specific installation guidelines/norms may do works with 230 Volt mains power. Prior to the assembly of the
product, the voltage network has to be switched off and ensured against re-switching.
The product is permitted only for proper use as specified in the user manual. Any kind of guarantee claim has to be forfeited if changes, modifications or painting are undertaken. The
product must be checked for damages immediately after unpacking. In the case of damages, the product must not be operated in any case. If a danger-free operation of the equipment
cannot be assured, the voltage supply has to be interrupted immediately and the equipment has to be protected from unintended operation.