Ariston CLAS SYSTEM One Panduan Pengguna - Halaman 4

Jelajahi secara online atau unduh pdf Panduan Pengguna untuk Ketel uap Ariston CLAS SYSTEM One. Ariston CLAS SYSTEM One 12 halaman. Condensing wall-hung gas boiler

Ariston CLAS SYSTEM One Panduan Pengguna
USER'S MANUAL
The installation and first ignition of the
boiler must be performed by qualified Gas
Safe Registered engineer in compliance with
Gas Safety (instillation & use) regulations
and all other national regulations regarding
installation, and in conformity with any
requirements established by local authorities
and public health organisations.
After the boiler has been installed, the installer
must ensure that the end user receives the
declaration of conformity and the operating
manual, and should provide all necessary
information as to how the boiler and the safety
devices should be handled.
This appliance is designed to produce hot water for domestic
use (combi version).
It should be connected to a heating system and a distribution
network for domestic hot water, both of which must be compatible
with its performance and power levels.
The use of the appliance for purposes other than those
specified is strictly forbidden. The manufacturer cannot be held
responsible for any damage caused by improper, incorrect and
unreasonable use of the appliance or by the failure to comply
with the instructions given in this manual.
Installation, maintenance and all other interventions must be
carried out in full conformity with the governing legal regulations
and the instructions provided by the manufacturer. Incorrect
installation can harm persons, animals and possessions; the
manufacturing company shall not be held responsible for any
damage caused as a result.
In the event of any maintenance or other structural work in the
immediate vicinity of the ducts or flue gas exhaust devices and
their accessories, switch the appliance off by switching the
external bipolar switch to the "OFF" position and shutting off the
gas valve.
When the work has been completed, ask a qualified technician
to check the efficiency of the ducting and the devices.
If the boiler should be out of use for a prolonged period, it is
recommended that the electrical power supply be disconnected
and that the external gas cock be closed. If low temperatures are
expected, the boiler and system pipe work should be drained in
order to prevent frost damage.
Turn the boiler off and turn the external switch "OFF" to clean
the exterior parts of the appliance.
Do not allow children or inexperienced persons to use the
appliance without supervision.
CE labelling
The CE mark guarantees that the appliance conforms to the
following directives:
- 2009/142/CEE
relating to gas appliances
2014/30/EU
-
relating to electromagnetic compatibility
- 92/42/CEE
relating to energy efficiency
2014/35/EU
-
relating to electrical safety
- 2009/125/CE
Energy related Products
- 813/2013
Commission regulation (EU)
4
/
Do not forget the Log Book!
The Benchmark Scheme
Benchmark
places
responsibilities
manufacturers and installers.
The purpose is to ensure that customers are
provided with the correct equipment for their
needs, that it is installed, commissioned and
serviced in accordance with the manufacturer's
instructions by competent persons and that it
meets the requirements of the appropriate Building
Regulations.
The Benchmark Checklist can be used to
demonstrate compliance with Building Regulations
and should be provided to the customer for future
reference.
Installers are required to carry out installation,
commissioning and servicing work in accordance
with the Benchmark Code of Practice which is
available from the Heating and Hotwater Industry
Council who manage and promote the Scheme.
www.centralheating.co.uk
Visit
information.
on
both
for more