Ariston SB 125 Indirect Panduan Petunjuk Instalasi - Halaman 15

Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Ketel uap Ariston SB 125 Indirect. Ariston SB 125 Indirect 20 halaman. Type c

Ariston SB 125 Indirect Panduan Petunjuk Instalasi
4.2
C
P
ONTROL
ANEL
L
:
EGEND
A - On/Off button
B - On/Off L.E.D. green (frost protection active)
C - Central Heating button
D - Cental Heating active L.E.D. green
E - Ignition failure (lockout) and/or overheat reset button
F - Ignition failure (lockout) and/or overheat L.E.D. red
G - Central heating temperature adjustment
H - Energy Saving System (ESS)
- Knock-out for time clock
I
J - Heating system pressure gauge
4.3
R
EMOVING THE
F
P
RONT
ANEL
1
A
2
3
Supplied By www.heating spares.co Tel. 0161 620 6677
F
. 4.1
IG
In order to access the inside of the boiler, it is necessary to
unscrew the fastening screws "A" of the control panel located on
the lower part of the panel itself.
The control panel moves downward and when pulled forward
rotates on two lateral hinges.
The panel stays in a semi-horizontal position, which allows
access to the inner parts of the boiler.
In order to increase the manoeuvring space, it is possible to raise
the control panel and rotate it to a fully horizontal position.
To dismantle the front casing panel it is necessary to:
1 - Remove the two screws "B";
2 - Move the front casing panel up and lift forward.
4
5
15
B