Acom 1500 Manual Penggantian - Halaman 6
Jelajahi secara online atau unduh pdf Manual Penggantian untuk Penguat Acom 1500. Acom 1500 9 halaman. Tube replacement
6. Adjustment of the Idling Current.
After each tube replacement, the BIAS voltage needs to be re-adjusted in order to
individually align the tube operating regime. There is an information screen
"Plate Current" on the display, foreseen to monitor the plate current during this
procedure. The two adjustment trimmer-potentiometers are located on the MAINS PCB.
a) Install the aluminum RF-screen cover of the RF deck (18 countersunk screws).
Put and tighten provisionally two small strip pieces to two of the nuts on the
middle chassis wall which are close to the HV LID crowbar as well as to the cover-
presence micro-switch sensor (around the two yellow arrows in the picture below).
These will provisionally imitate a top cover presence during the adjustment
procedure. Check that the provisional pieces are tightened reliably in order not
to let them slip the crowbar or the cover-sensing switch during the next
operations.
W A R N I N G
HIGH VOLTAGE!
===========================
Be careful - HIGH VOLTAGES up to 3000V will exist permanently on the accessible
wiring and on the PCBs which is
track that nobody could access the amplifier and do not leave it without
supervision during all the time that the amplifier is with the cover removed!
Connect a dummy load (or an antenna) to the output. Install all cables to the
exciter as usually. Now, feed mains voltage, turn on the amplifier and let the
tube warming up for at least 15 minutes in STANDBY mode.
and all accessible HV parts during this period!
LETHAL!
Keep away of the parts and the PCBs! Keep
Safeguard the amplifier
6