Whirlpool CEM2750JQ0 Panduan Instalasi - Halaman 7
Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Pengering Whirlpool CEM2750JQ0. Whirlpool CEM2750JQ0 14 halaman. Commercial gas/electric dryer
Electrical
requirements
if codes permit and o separate
ground wire is used, It Is
recommended that a qualified
electdclan determine that the ground
path is adequate.
important: Observe all governing
codes and ordinances.
A four-wlre orthree-wire (Canada:
four-wire only), s Lngle-phase, 120/240-
volt, 6 0-Hz, AC-onlyelectrlcal
supply
(or four-wlre orthree-wLre, 120/208-
volt, i f specified o n themodel/serial
rating plate) is required on a
separate, 30-ampere circuit,
fusedon
both sides ofthe line. A time-delay
fuseorcircuit breaker is
recommended.
Recommended
ground method
In U.S.:
It is the persenal
responsibility
and
obligation
of the customer
to contact
a qualified
electrician
to assure that
the electrical
Installation
is adequate
and in conformance
with the
National
Electrical
Code,
ANSI/NFPA
70", and all local codes
and
ordinances.
In Canada.:
it isthe personal
responsibility
and
obligation
of the customer
to
install the dryer in accordance
with CAN I-B149 installation
codes**
and all national
or local
codes.
Canadian
models are equipped
with a four-wire,
30-amp
rated
flexible-type
power
cord. The
power
cord must be plugged
into
a mating
30-amp
receptacle.
(NEMA type
14-30R).
Copies of the standards listed above may
be obtained from:
* National Fire Protection Association
One Balterymarch Park
Quincy, Massachusetts 02269
**CSA International
8501 East Pleasant Valley Road
Cleveland, Ohio 44131-5575
Now Start...
Excessive Weight Hazard
Use two or more peopleto move and
install dryer,
Failureto do so can result in back or
other injury.
With dryer in laundry area...
exhausr_'_
vent
box
l
mTake tape off front corners of
dryer. Open dryer and remove the
literature and parts packages. Wipe
the interior of the drum thoroughly
with a damp cloth.
mTake two of the cardboard
corners from the carton
and place
them on the floor in back
of the dryer.
Firmly grasp the body of the dryer
and gently lay ff on its back on the
cardboard
corners,
3_
With one of the legs in hand,
check
the ridges for a diamond
marking.
That's how far the leg is
supposed
to go into the hole.
4m Start to screw the leveling legs
into the holes by hand, (Use a small
amount of liquid detergent to
lubricate the screw threads so it is
easier to turn the legs.) Use a 1-inch
wrench or socket wrench to finish
turning the legs unfil you reach the
diamond mark.
Now standthe dryer up.
Slide dryer onto cardboard or
hardboard before moving across floor
to avoid damaglng floor covedng.
5m Remove the service door of the
meter case, Uft
the service door
up at the back
and remove.
Install money-
accepting
device. (Refer to
manufaturer's
Instructions for proper Installation,)
For dryers using coin slides, use
adapter kit supplied with dryer.
Replace the meter case service door.
Put the coin vault with lock and key
the meter case opening.
6m
Move dryer close to final
position.
Remove
cardboard
or
hardboard
from under dryer.
Page 7