Whirlpool AKR 812 Lembar Data Instalasi - Halaman 26

Jelajahi secara online atau unduh pdf Lembar Data Instalasi untuk Kap Ventilasi Whirlpool AKR 812. Whirlpool AKR 812 28 halaman.

Whirlpool AKR 812 Lembar Data Instalasi
31833160.fm Page 26 Friday, April 1, 2005 6:48 PM
AKR 631-666-812-966
AKR 943-948-952-995-996
INSTALLATION - ASSEMBLY INSTRUCTIONS
Remove the perimeter extraction panel (if relevant) and the grease filter/s.
Pre-assemble the steam deflector on the motor assembly (if relevant): (a.) fit the steam deflector to the rails of
the motor assembly (remove the two travel stop screws from the steam deflector if necessary), (b.) connect
up the control panel and the lamps, (c.) fix in place with the 14 screws (max).
Mark a line on the wall right up to the ceiling, corresponding to the centre-line of the hood.
1.
Apply the drilling template to the wall: Align the vertical centre-line on the drilling template with the centre-
2.
line drawn on the wall. The template's bottom edge represents the bottom edge of the hood.
Place the mounting bracket over the drilling template so that it matches the outlined rectangle. Mark and
3.
drill the two outside holes. Remove the drilling template. Insert two wall plugs in the holes and fix the hood
mounting bracket in place with two 5 x 45 mm screws.
Hang the hood on the mounting bracket. Adjust gap (5.) and the horizontal alignment (6.) of the hood.
4.
Remove the hood from the bracket. Drill the holes (9. - Ø 8 mm - see step 7.). Insert two wall plugs (10.).
5.
Apply the flue mounting bracket G to the wall against the ceiling. (Align the small slot in the bracket with
6.
the centre-line drawn on the wall. See step 1. Fix the bracket in place with two wall plugs (Ø 8 mm) and
2 screws 12).
Hang the hood on the bottom mounting bracket. (14.) Fix the hood to the wall with two 5 x 45 mm screws
7.
(ABSOLUTELY NECESSARY). Plug the two holes if they are visible from the outside.
Connect an exhaust pipe to the to the collar B, the fumes must be ducted to the outside (extractor version)
8.
or towards the deflector (filter version). Fix the deflector F to the flue support bracket G with 4 screws
(2 screws only for 120 cm wide model). If the collar (bayonet coupling) is not already fitted, insert it on
the deflector F and secure it with 1 screw.
Make all necessary electrical connections.
9.
Apply the flues and fix them with 2 screws (17a) to the flue support G (17b).
10.
Slide the bottom section of the flue all the way over the extraction unit until it engages the seat above the
11.
hood.
(120 cm wide model only) fix the bottom section of the flue to the hood with 2 screws.
12.
Re-fit the grease filter/s and, if a perimeter extraction panel is fitted, check for correct operation.
Important! Only for model AKR 996: proceed with hob selection and manual calibration of the sensors. For
this purpose, read the paragraph on the next page "Important - upon initial installation ".
Control panel.
1.
Grease filter.
2.
Halogen bulbs.
3.
Steam deflector.
4.
Telescopic flue.
5.
Perimeter extraction
6.
panel (if fitted) and
release handle (f3).
Sensors (only present
7.
on some models).
5019 318 33160
PL
CZ
SK
H RUS BG
RO
GB