ErgoCentric upCentric Power & Data Rail Manual - Halaman 11

Jelajahi secara online atau unduh pdf Manual untuk Rak dan Dudukan ErgoCentric upCentric Power & Data Rail. ErgoCentric upCentric Power & Data Rail 19 halaman.

Installation Guide
upCentric Power & Data Rail
Step 5: Install Jumpers to interconnect all rails:
a. Begin with the First Rail and install a Jumper between the first
and second rail . Run the Jumper through the connector leg,
and attach each end to the nearest Junction Block (D).
b . Repeat this process until every rail in the system is connected
to the Power Infeed Rail .
DETAIL A
SCALE 1 : 1
upCentric Power & Data Rail | Installation Guide
NOTE: To facilitate the process of
connecting multiple jumpers in a
connector leg, the cable troughs above
the power jumpers can be unpinned to
create additional space .
11