ErgoCentric upCentric Power & Data Rail Manual - Halaman 14

Jelajahi secara online atau unduh pdf Manual untuk Rak dan Dudukan ErgoCentric upCentric Power & Data Rail. ErgoCentric upCentric Power & Data Rail 19 halaman.

Installation Guide
upCentric Power & Data Rail
Step 7: Connect and test the system:
Note: Power Infeed Cable must be installed before performing this step .
Power Infeeds must be installed by a licensed electrician . Please see Power
Infeed Electrical Installation guide for details .

Wall Power Infeed:

a) Route the Power Infeed Cable into the system through the lower opening
on the Infeed plate and connect it to the first power block.
b) Test all Duplexes to ensure proper connectivity and functionality .
upCentric Power & Data Rail | Installation Guide
14