ABB SafeRing Panduan Petunjuk Instalasi - Halaman 12
Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Unit Kontrol ABB SafeRing. ABB SafeRing 12 halaman. Retrofit of opening coil y1 and auxiliary switch s7 f, c and si modules with latched mechanism
Juga untuk ABB SafeRing: Panduan Petunjuk Instalasi (15 halaman)
We reserve all rights in this document and in the information contained therein: Reproduction, use or disclosure to third
parties without express authority is strictly forbidden. © ABB Technology Ltd.
X1
7
7. Fix the bracket for capacitive voltage indicator, which was removed
during step 2
Fest braketten for kapasitiv spenningsindikator som ble fjernet under
punkt 2
8. Fix the position indicator, which was removed during step 3
Fest stillingsindikeringen som ble fjernet under punkt 3
9. Re-place and fix the front covers
Sett tilbake og fest frontdekslene
ABB
ABB Technology Ltd.
8
S10
S7
Edition
1.0
X1
7
Cog wheel arrow shall point to the
straight line
Pilen i tannhjulet skal peke mot den
rette linjen
Document No.
1VDD200010
S10
S7
8
Sheet No.
12/12