ABB SafeRing Panduan Petunjuk Instalasi - Halaman 5

Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Unit Kontrol ABB SafeRing. ABB SafeRing 15 halaman. Retrofit of opening coil y1 and auxiliary switch s7 f, c and si modules with latched mechanism
Juga untuk ABB SafeRing: Panduan Petunjuk Instalasi (12 halaman)

ABB SafeRing Panduan Petunjuk Instalasi
We reserve all rights in this document and in the information contained therein: Reproduction, use or disclosure to third
parties without express authority is strictly forbidden. © ABB Technology Ltd.
6
6. Unscrew and remove the bracket for capacitive voltage indication
Skru av braketten for kapasitiv spenningsindikering
*
Depending on SafeRing / SafePlus production year, the position
indicator may be different compared to the drawing above. Please
refer to Appendix A, if your position indicator is different
*
Avhengig av når SafeRing / SafePlus anlegget er produsert, kan
stillingsindikeringen være forskjellig fra tegningen over. Hvis dette er
tilfelle, vennligst se Appendix A for eldre stillingsindikatorer
7. Unscrew and remove the padlock bracket
Skru av hengelåsbraketten
ABB
ABB Technology Ltd.
*
Edition
Document No.
1.0
1VDD200027
Sheet No.
5/15