Zanussi ZGH75524XB Panduan Pengguna - Halaman 7

Jelajahi secara online atau unduh pdf Panduan Pengguna untuk Kompor Zanussi ZGH75524XB. Zanussi ZGH75524XB 20 halaman.

INJECTORS REPLACEMENT
1. Remove the pan supports.
2. Remove the caps and crowns of the burner.
3. With a socket spanner 7 remove the injectors
and replace them with the ones which are
necessary for the type of gas you use (see
table in "Technical Data" chapter).
4. Assemble the parts, follow the same procedure
backwards.
5. Replace the rating plate (it is near the gas
supply pipe) with the one for the new type of
gas supply. You can find this plate in the
package supplied with the appliance.
If the supply gas pressure is changeable or
different from the necessary pressure, you must fit
an applicable pressure adjuster on the gas supply
pipe.
ADJUSTMENT OF MINIMUM LEVEL
To adjust the minimum level of the burners:
1. Light the burner.
2. Turn the knob on the minimum position.
3. Remove the knob and the gasket.
4. With a thin screwdriver, adjust the bypass
screw position (A).
A
5. If you change:
from natural gas G20 20 mbar to liquid gas,
fully tighten the bypass screw in.
from liquid gas to natural gas G20 20 mbar,
undo the bypass screw approximately 1/4
of a turn (1/2 of a turn for Multi Crown
burner).
6. Reassemble the gasket and the knob.
WARNING! Make sure the flame does
not go out when you quickly turn the
knob from the maximum position to the
minimum position.
ELECTRICAL CONNECTION
Do not pull the mains cable to disconnect the
appliance. Always pull the mains plug (if
applicable).
The appliance must not be connected with an
extension cable, an adapter or a multiple socket.
There is a risk of fire.
Do not let the power cable to heat up to a
temperature of more than 90° C. The cable
should be guided by means of clamps fixed to
the side of the cabinet, in order to avoid any
contact with the appliance beneath the cooktop.
Make sure that there is access to the mains plug
after the installation.
Electrical Requirements
Permanent electrical installation must agree with
the latest I.E.E. Regulations and local Electricity
Board regulations. For your own safety the
installation must be done by a qualified electrician
(e.g. your local Electricity Board, or a contractor
who is on the roll of the National Inspection Council
for Electrical Installation Contracting [NICEIC]).
The manufacturer refuses to be
held responsible, if these safety
measures are not abided by.
7