Zanussi ZHC960 Buklet Instruksi - Halaman 11
Jelajahi secara online atau unduh pdf Buklet Instruksi untuk Kap Ventilasi Zanussi ZHC960. Zanussi ZHC960 17 halaman. Zanussi owners manual ventilation hood zhc960
Juga untuk Zanussi ZHC960: Panduan Petunjuk Pengoperasian (13 halaman)
Please ensure that when the appliance is
installed it is easily accessible to an
engineer in the event of a breakdown.
All installations must comply with the local
authorities requirements for the discharge
of exhaust air.
Incorrect installation may affect the safety
of this cooker hood.
Installation Requirements
Before installation check that the wall to
which the cooker hood is to be fitted for
electric cables, water pipes and gas.
This cooker hood is designed to be fixed to any
vertical surface over a cooking area, and can
be used in the extraction mode (ducting to the
outside) or recycling mode (filtered).
The installation work must be undertaken by a
qualified and competent person.
The manufacturer disclaims any responsibility
for damage due to incorrect installation of the
cooker hood or if the hood is not installed in
compliance with relevant regulations controlling
this type of installation.
Unpacking
Before unpacking the cooker hood position the
carton with the arrows pointing upwards as
illustrated on the carton.
The cooker hood is made up of the following
components:
Ref Qty Product Components
1
1
Hood body, complete with controls,
lighting, fan and filters.
2
1
Telescopic Chimney comprising:
2.1 1
Upper section
2.2 1
Lower section
8a
1
Right recirculated air oulet grille
8b
1
Left recirculated air outlet grille
∅150-120 Ducting spigot
9
1
∅120-125 Ducting flange
10
1
14
1
Recirculated air extension tube
14.1 2
Recirculated air outlet extensions
15
1
Air outlet connector
Ref Qty Installation Components
7.2 2
Upper chimney wall fixing brackets
12c 6
Chimney fixing screws
Ref Qty Documentation
1
Instruction booklet
1
Warranty
INSTALLATION INSTRUCTIONS
Page 11