Aleko SHEM8BLK Panduan Instalasi & Pemilik - Halaman 8
Jelajahi secara online atau unduh pdf Panduan Instalasi & Pemilik untuk Produk Pipa Aleko SHEM8BLK. Aleko SHEM8BLK 20 halaman. Outdoor sauna
06
Step 4: Connect Remaining Floor Staves & Secure in Place
Connect the remaining floor staves (right side: 31-38; left
side: 117-124) using the carved grooves. Once you reach the
top of the base on both sides, secure with screws.
Step 5: Connect Remaining Staves for Side, Roof & Back
Walls
Repeat steps 1 & 2 to connect the remaining staves for your
sauna's, roof, back, and side walls. (right side: 39-53; left
side: 102-116; back panel: 125-165; roof: 63-92)