Clarke C31 Aplikasi Produk, Panduan Pemasangan dan Servis - Halaman 4
Jelajahi secara online atau unduh pdf Aplikasi Produk, Panduan Pemasangan dan Servis untuk Pompa Air Clarke C31. Clarke C31 10 halaman. Electric motor driven fire pumps
3 – Parallel Offset Alignment (P)
Align so that a straight edge rests squarely (or within the
limits specified in Table 2) on both hubs as shown above
and also at 90° intervals.
clearance must not exceed the PARALLEL OFFSET
installation limits specified in Table 2.
4 – Insert Grid
Completely pack gap and grooves with LTG Grease (or
equal) before inserting grid. When grids are furnished in
two or more segments, install them so that all cut ends
extend in the same direction (as detailed in the exploded
view picture above); this will assure correct grid contact
with non-rotating pin in cover halves. Spread the grid
slightly to pass over the coupling teeth and seat with a
soft mallet.
Check with feelers.
The
Page 4 of 10
5 – Pack with Grease and Assemble Covers
Completely pack the spaces between and around the grid
with as much LTG Grease as possible and wipe off excess
flush with top of grid. Position seals on hubs to line up
with grooves in cover. Position gaskets on flange of
lower cover half and assemble covers so that the match
marks are on the same side (see above). If shafts are not
level (horizontal) or coupling is to be used vertically,
assemble cover halves with the lug and match mark UP or
on the high side. Push gaskets in until they stop against
the seals and secure cover halves with fasteners,
tightening to torque specified in Table 2. Make sure
gaskets stay in position during tightening of fasteners.
CAUTION: Make certain lube plugs are installed before
operating.