Alemite 7338-C Panduan Servis - Halaman 7

Jelajahi secara online atau unduh pdf Panduan Servis untuk Peralatan Alemite 7338-C. Alemite 7338-C 12 halaman. Severe-duty welding hose reel

Alemite 7338-C Panduan Servis
Severe-Duty Welding Hose Reel
Figure 3 Severe-Duty Welding Hose Reel - Section View
Alemite Corporation
Refer to Figure 2
Parts List
for Parts Identification
7
Base and Hose Guide Assembly
11. Install Bolts (39) into Shaft and Flange
Assembly (40).
12. Secure the Shaft and Flange Assembly to
the Base Assembly with Nuts (38).
• Tighten the Nuts securely in a criss-
cross pattern.
13. Position Hose Guide Arm (29) onto the
Bolts in the Base Assembly.
NOTE: The Hose Guide Arm
can attach to the Base Assembly
in five (5) different positions.
Select the required relationship
of the Guide to the mounting
plate of the Base Assembly.
14. Secure the Hose Guide Arm to the Base
Assembly with Nuts (30).
• Tighten the Nuts securely in a criss-
cross pattern.
15. Install one O-Ring (41) onto the inner
groove [closest to the flange] of the Shaft
and Flange Assembly.
16. Install and seat Ball Bearing (42) onto the
Shaft and Flange Assembly and over the
O-Ring.
• Use care not to damage the O-Ring
Figure 4 Swivel Assembly - Section View
SER 7338-C
Revision (12-07)