Alemite 7340 Panduan Servis - Halaman 9

Jelajahi secara online atau unduh pdf Panduan Servis untuk Peralatan Alemite 7340. Alemite 7340 16 halaman. High-capacity
Juga untuk Alemite 7340: Panduan Servis (12 halaman)

Alemite 7340 Panduan Servis
Space required for banked reels (with bolt pattern dimensions)
Ø 25 in
(635 mm)
1)
3)
1)
To supply line
2)
Clamp (not included)
3)
Connecting hose (not included)
4)
Total width
9 Install u-bolt (11) onto the delivery hose
and to the sheave assembly.
10 Install washers (10) and wing nuts (9)
onto the ubolt.
10.1 Tighten the wing nuts securely.
Accessories attachment and
pressurization
11 Install the control valve onto the delivery
hose.
12 Pressurize the system.
12.1 Check for leaks.
13 Install and secure the hose stop to the
delivery hose at the desired position.
2)
14.96 in
(380 m)
14 Make sure the reel is latched then:
– Instruct the assistant to let go of the
sheave assembly or
– carefully remove the clamp from the
Sheave Assembly
15 Pull the delivery hose to disengage the
Ratchet.
16 Allow the delivery hose to slowly retract
onto the sheave assembly.
11.44 in
(290 mm)
13.38 in
(340 mm)
4)
Ø 0.53 in
(13.5 mm)
9
2.5 in
(63.5 mm)

Checking spring tension

17 Check to ensure the tension on the
power spring is sufficient to properly
hold the hose stop against the hose
guide.
Should the power spring tension require
adjustment:
Fig. 3
26.16 in
(665 mm)