Acorn Safety S0706 Petunjuk Pemasangan, Pengoperasian, dan Pemeliharaan - Halaman 3

Jelajahi secara online atau unduh pdf Petunjuk Pemasangan, Pengoperasian, dan Pemeliharaan untuk Produk Pipa Acorn Safety S0706. Acorn Safety S0706 5 halaman. Deck mounted eyewash drench hose

Installation & Operation Manual

INSTALLATION INSTRUCTION:

Supplies required: (not provided by Acorn)
1. Wall fasteners for signage & possible eye/face wash
mounting.
2. Pipe sealant or Teflon tape for sealing water
connections.
IMPORTANT: FLUSH WATER SUPPLY LINES PRIOR
TO CONNECTION TO SAFETY EQUIPMENT.
NOTES:
· Use hand tools and wrenches in a manner which will
prevent marring finished surfaces. Strap wrenches or
tools with plastic jaw linings are highly
recommended.
Refer to Rough-in for location of supply and drain
lines.
Fragments of Teflon tape or pipe sealant residue can
interfere with the proper operation of this unit. Ensure
pipe sealant methods do not cause contamination in
the system.
STEP ONE: MOUNTING
1. Determine desired mounting location and drill 1 3/8'
DIA. mounting hole through counter top.
2. Insert deck escutcheon through hole and secure in
place with washer and retaining nut (provided) from
underneath counter top.
3. Insert drench hose assembly down into mounted
escutcheon.
STEP TWO:SUPPLY LINE
1. Install water line (supplied by others) in close
proximity to drench hose location.
2. Connect 3/8" NPT reinforced hose (supplied with
drench hose) to plumbed water supply.
3. Open water supply.
4. Test for leaks, proper operation and flow.
STEP THREE:SINAGE & INSPECTION
1. Position sign with clear visibility, in close proximity to
safety equipment and mark mounting hole locations.
2. Select appropriate 1/4" anchors, screws and washers
(Supplied by others) to install signage.
3. Attach inspection tag supplied, with plastic zip tie.
Acorn Safety
a division of Acorn Engineering
Manual #7109-505-001
MOUNTING SCREWS
(PROVIDED BY
INSTALLER)
DRENCH HOSE
ASSY
DECK
ESCUTCHEON
3/8" NPT FITTING
CONNECT TO
WASTE LINE
(SUPPLIED BY
INSTALLER)
Company
Page 3 of 5
Revised: 03/22/13