Prior to starting the pump, pre-charge the dampener to approximately 80% of expected system pressure and
replace fill valve cap. DO NOT USE OXYGEN. The pre-charge pressure in the dampener must always be lower
than pump discharge pressure. Generally, pulsation is most effectively minimized when the gas pre-charge is 80%
of system pressure. Start the pump to generate system pressure. The dampener charge pressure may need to be
adjusted up or down to be most effective in reducing pulsation. NOTE: The most effective method to set the
proper dampener charge is to install a pressure gauge downstream of the dampener and adjust the dampener to
minimize needle movement on the gauge.
Once system pressure is in contact with the bladder/bellows, the gas charge will be compressed to the
system pressure and the dampener gauge will read the system pressure, not the initial charge pressure.
Once working pressure is achieved, adjustment may be necessary.
charge in the dampener by bleeding or filling through the gas valve.
adjustment (this may take a minute or two) before making further adjustments.
R
B
I
EAD
EFORE
NSTALLATION
Step 1 — Installation Position
Install the dampener in-line, as close to the pump inlet as possible and after any upstream equipment such as
risers, valves, elbows, meters, or filters. Dampener installation should be no more than ten pipe diameters from
pump inlet. If using a flexible connector on the inlet side of the pump between the system piping and pump, the
dampener should be installed on a tee at the pump inlet manifold. The flexible connector should be attached to
the dampener's tee and system piping (see FIGURE 1).
upstream of the dampener to aid in proper dampener adjustment.
Step 2 — Charging and Start-Up (see Pre-Charge Notes)
Chargeable models do not require an air line connection. Dampener must be pre-charged with compressed air or
Nitrogen, using a hand pump, Nitrogen tank/bottle, or compressor. DO NOT USE OXYGEN. Charging hose kits
are available from BLACOH.
A. Suction Lift/Dampener: When using the dampener in a suction lift application no pre-charge is required. Start
the pump to generate working pressure.
created with each suction stroke will compress the air trapped in the bladder/bellows.
B. Positive Inlet Pressure: Pre-charge the dampener with 50% of the static system pressure realized at the
pump inlet. Start the pump to generate working pressure. Minor pressure adjustments may be required. Allow
the system to respond to each adjustment (this may take a minute or two) before making further adjustments.
INLET STABILIZER
COMPOUND
PRESSURE GAUGE
10"
15"
5"
20"
0
25"
10"
20"
Psi
30"
INLET
FILTER
7
I
NSTALLATION FOR
As system pressure and vacuum is created, the acceleration head
ISOLATION
VALVE
30"
FLEX
CONNECTOR
BLACOH F
Gradually increase or decrease the gas
Allow the system to respond to each
P
I
UMP
NLET
A compound pressure gauge should be installed
PULSATION DAMPENER
FLEX
ISOLATION
CONNECTOR
VALVE
PUMP
C
, I
.
LUID
ONTROL
NC
R
B
I
EAD
EFORE
NSTALLATION
F
1
I G U R E
PRESSURE GAUGE/
INSTRUMENTATION
BLACOH
DISCHARGE
ALTERNATE MOUNTING
METHOD
PUMP