Acoustic Signature ASCONA NEO Manual - Halaman 4
Jelajahi secara online atau unduh pdf Manual untuk Peralatan Musik Acoustic Signature ASCONA NEO. Acoustic Signature ASCONA NEO 12 halaman.
Setup
Preparation
To avoid transport damages the Ascona Neo
comes in a carefully designed packing (2 boxes)
and is partially preassembled.
We recommend having a plane area of about
600x600mm² / 24x24 square inch for setup.
First, take out the baseplate from box 1 and
place it on the designated operating place.
Now you can set the chassis onto the baseplate.
Please make sure that the ball in each foot fits in
the recess of the baseplate.
Levelling
After placing baseplate and chassis you can now
level the turntable by turning the 3 feet in the
chassis.
Use a suitable bubble level for adjustment (e. g.
Acoustic-Signatures dual axis bubble level, see
picture below).
Aufbau
Vorbereitung
Um Transportschäden zu vermeiden wird der
Plattenspieler sorgfältig verpackt (2 Kartons)
und teilweise vormontiert geliefert.
Für den Aufbau benötigen Sie eine ebene Fläche
von ca. 600x600mm².
Beginnen Sie mit Karton 1, nehmen Sie vorsich-
tig die Basisplatte aus der Verpackung und stel-
len sie auf den vorgesehenen Betriebsplatz.
Nun setzen Sie das Chassis auf die Basisplatte.
Achten Sie dabei auf Ausrichtung der Kugel im
Fuss zur Senkung in der Basisplatte.
Ausrichten
Nach dem Aufstellen von Basiseinheit und Chas-
sis können Sie den Plattenspieler nun durch Ver-
drehen der Einstellknöpfe im Chassis ausrichten.
Verwenden Sie eine geeignete Wasserwaage (z.
B.
Acoustic-Signatures
siehe Bild unten).
4
Doppel-Wasserwaage,