Baltimore Aircoil Company TSU 1440D Petunjuk Pemasangan dan Pemasangan - Halaman 2
Jelajahi secara online atau unduh pdf Petunjuk Pemasangan dan Pemasangan untuk Kelistrikan Industri Baltimore Aircoil Company TSU 1440D. Baltimore Aircoil Company TSU 1440D 20 halaman. Tsu-c-d ice chiller thermal storage unit for external melt
About Rigging and Installation
The BAC equipment should be rigged and installed as outlined in this bulletin.
These procedures should be thoroughly reviewed prior to the rigging and operation to acquaint all personnel with
the procedures to be followed and to assure that all necessary equipment will be available at the jobsite.
Recommended Maintenance and
Monitoring Programme
Inspections and Monitoring
General condition
®
ICE CHILLER
Tank
®
(1)
ICE CHILLER
Water
- Quality
- Level
Ice Thickness
Coil
ICE LOGIC™ Ice Quantity controller:
- condition of sensor
- conductivity of tank water
Air Pump
- Air Filter Replacement
Refrigerant:
- Glycol quality
- NH
purge oil
3
Air Distribution Piping
Cleaning procedures
Mechanical cleaning
- Air filter
Disinfection
Notes
1. Water Treatment and auxiliary equipment integrated in the cooling system may require additions to the table
above. Contact suppliers for recommended actions and their required frequency.
2. Recommended service intervals are for typical installations. Different environmental conditions may dictate
more frequent servicing.
3. When operating in ambient temperatures below freezing, the unit should be inspected more frequently.
2
W W W . B A L T I M O R E A I R C O I L . E U
Start-Up
Monthly
Quaterly
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Start-Up
Monthly
Quaterly
X
X
X
Every 6 Months
X
X
X
X
Every 6 Months
X
Annually
Shutdown
X
X
Annually
Shutdown
X
X
X
X