Camoplast ATV T4S Panduan Instalasi - Halaman 8

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Kendaraan Offroad Camoplast ATV T4S. Camoplast ATV T4S 13 halaman. Atv track system
Juga untuk Camoplast ATV T4S: Panduan Instalasi (14 halaman), Panduan Instalasi (19 halaman), Panduan Instalasi (15 halaman), Panduan Instalasi (16 halaman), Panduan Instalasi (20 halaman), Panduan Instalasi (17 halaman), Manual (16 halaman), Panduan Instalasi (16 halaman)

Camoplast ATV T4S Panduan Instalasi
Figure 7
h. Attach the stabilizing rod (2) to the anchor
bracket (1)
using
flatwasher (5) and nut (3). Torque to 35 N•m or
25 lbf•ft. Refer to Figure 8.
NOTE: Ensure that parts are assembled in the
correct order.
NOTE: The distance between the nut and the rod
end must be 3/4 in (19 mm).
Figure 8
i.
Lower the ATV to the ground and install the
track systems at the front of the ATV.
Installation Guidelines / Directives d'installation
the
two
bushings (4),
h. Fixer le bras stabilisateur (2) au boulon déjà
installé sur l'ancrage de suspension (1) à l'aide
des deux espaceurs (4), de la rondelle (5) et de
l'écrou autobloquant (3). Serrer à 35 N•m ou
25 lbf•pi. Voir la Figure 8.
NOTA: S'assurer d'assembler les pièces dans
l'ordre indiqué.
NOTA: La distance entre l'écrou et la rotule doit
être de 19 mm (34 po).
i.
Abaisser le VTT au sol et procéder ensuite à
l'installation des systèmes de traction avant du
VTT.
Page 7
©2013 Camoplast Inc.