Dixon Bayco FT390G Petunjuk Pemeliharaan & Pengoperasian - Halaman 2
Jelajahi secara online atau unduh pdf Petunjuk Pemeliharaan & Pengoperasian untuk Aksesori Dixon Bayco FT390G. Dixon Bayco FT390G 5 halaman. Trailer mounted dual sockets
FT390 Series Trailer Mounted Dual Sockets
PRODUCT DESCRIPTIONS:
These instructions cover the following FloTech products:
FT390 Basic Dual Socket
FT390G Dual Socket with Ground Bolt Installed
FT390GT Dual Socket with Ground Bolt and Trailer I.D. Module
Installed
FT390Pxx Plug & Play Version
FT390V Basic Dual Socket – Vertical Mounting
FT391 Dual Socket with 4J Slots on Optic & Thermistor
FT391G Dual Socket with 4J Slots on Optic & Thermistor & Ground
Bolt Installed
FT391GT Dual Socket with 4J Slots on Optic & Thermistor & Ground
Bolt & Trailer I.D. Module Installed
FT391V Dual Socket with 4J Slots on Optic & Thermistor – Vertical
Mounting
FT391VG Dual Socket with 4J Slots on Optic & Thermistor, Ground
Bolt Installed – Vertical Mounting
FloTech sockets are mechanically and functionally compatible with
API 1004 Cargo Tank Bottom Loading Recommended Practice.
INSTALLATION
Sockets are to be mounted on the same side of the trailer as the
bottom loading equipment. Sockets are normally located within 3 feet
of the bottom loading adapters so the rack plug and cord will reach the
socket without over stretching the cord. Use the socket body as a
template to drill four 5/16" holes as shown in Diagram 1. Mount the
socket body to the trailer using four 5/16" bolts and lock washers.
DIAGRAM 1
2
877.582.3569
FT390 SERIES