ClearSpan Premium Solar Star 104918 Manual Petunjuk Perakitan - Halaman 6

Jelajahi secara online atau unduh pdf Manual Petunjuk Perakitan untuk Kit Rumah Kaca ClearSpan Premium Solar Star 104918. ClearSpan Premium Solar Star 104918 17 halaman. Home-attached greenhouse

2. Secure the frame tubes at each corner using a
corner bracket and 3/4" Tek screws.
NOTE: To maintain the proper dimensions, the frame
tubes for the door and non-door ends must be seated
into the each corner bracket. See above and below
illustrations.
Door (or Non-Door)
Frame Tube
Front (or Back) Frame
Top View of Frame Tubes and Corner Bracket
NOTE: If the metal frame was not assembled on the
recycled plastic lumber frame, set the metal frame on the
plastic frame base.
3. After assembling the metal base and securing it with
the corner brackets, choose the first two panels (as
shown in the following diagram) and set them on the
metal frame.
NOTE: Install the panels with the UV-protected
polycarbonate to the outside and the frame to the inside.
Visit www.ClearSpan.com for additional products and customer assistance.
Door End
Base Frame
Front
Panel
NOTE: The angled panel is installed first and is seated
into the corner bracket. The short, front panel is installed
next and is flush with the front of the angled panel.
Door (or Non–
Door) End
Angled Panel
View is from the inside of the greenhouse looking at the
corner where the panels meet.
4. With the panels set in the corner and the edges tight
together, secure the panels to the corner bracket
using 3/4" Tek screws.
5. Secure the corner with a 3" x 3" square plate.
NOTE: All 3" x 3" square plates are attached to the
greenhouse on the inside using self-tapping screws. See
the photo that follows.
Non-Door End Panel
Front
Panel
Front Panel
Frame Base
5 of 16