ClearWater Microzone 500 Panduan Pemasangan & Pengoperasian - Halaman 4

Jelajahi secara online atau unduh pdf Panduan Pemasangan & Pengoperasian untuk Generator Portabel ClearWater Microzone 500. ClearWater Microzone 500 4 halaman. Ozone systems, corona discharge ozone generators

INJECTION METHOD INSTALLATION
step 1: Mount the Microzone ozone generator to a suitable flat surface, using the two
self-tapping screws provided. nOTe: The distance from the Microzone to the
injection port should be no more than 8 feet.
step 2: Attach one end of the supplied tubing to the ozone outlet port of the Microzone
generator and secure with a hose clamp provided.
step 3: Coil the tubing to create a "Hartford Loop" above the water line. Insert the check
valve provided at the highest point of the Hartford Loop (see Figure 3).
Determine orientation of the check valve by blowing through it, flow should be
directed to the point of use.
step 4: Attach the other end of the tubing to the injection port and secure with the hose
clamp provided.
step 5: Plug the Microzone into a suitable outlet. If the PRO Series system is being used,
the Microzone may be plugged into its switched outlet provided. nOTe: All
equipment wiring and grounding must comply with all local electrical codes.
Figure 1
Shown: PRO10 with Microzone 300 ozone generator
Switched
Power
Main Power
Water Flow
Injector Port
Microzone 300
O Z O N E
G E N E R A T O R
Air Flow
Check Valve
Water Flow
3
DIFFUSION METHOD INSTALLATION
step 1: Mount the Microzone ozone generator to a suitable flat surface, using the two
self-tapping screws provided. nOTe: The distance from the Microzone to point
of diffusion should be no more than 8 feet.
step 2: Cut a suitable length of the supplied tubing, attach one end to the air prep outlet
of the pressurized source used. Attach the other end to the air inlet port of the
Microzone and secure with a hose clamp provided.
step 3: Attach one end of the supplied tubing to the ozone outlet port of the Microzone
and secure with the hose clamp provided.
step 4: Coil the tubing to create a "Hartford Loop" above the water line. Insert the check
valve provided at the highest point of the Hartford Loop (see Figure 3).
Determine orientation of the check valve by blowing through it, flow should be
directed to the point of use.
step 5: Attach the opposite end of the tubing to the barbed fitting of the diffuser stone
provided.
step 6: Plug the Microzone into a suitable outlet. If the OAS7 is being used the
Microzone may be plugged into its switched outlet provided. nOTe: All
equipment wiring and grounding must comply with all local electrical codes.
Figure 2
Shown: OAS7 with Microzone 300 ozone generator
Air Prep Outlet
Switched
Power
note: OAS7 maximum head pressure: 6 feet
Air Flow
Microzone 300
O Z O N E
G E N E R A T O R
Air Flow
Check Valve
Diffuser Stone
Main Power
4