ALTUS APS-3 Panduan Memulai Cepat - Halaman 5

Jelajahi secara online atau unduh pdf Panduan Memulai Cepat untuk Penerima ALTUS APS-3. ALTUS APS-3 8 halaman. Positioning systems
Juga untuk ALTUS APS-3: Panduan Memulai Cepat (8 halaman), Panduan Memulai Cepat (2 halaman)

APS-3   B attery   R emoval,   C harge   a nd   I nstallation  
 
Complete   t he   f ollowing   s teps   f or   r emoval,   c harge   a nd  
installation   o f   A PS-3   b atteries.    
 
 
One   f ully-­‐charged   b attery   c an   b e   u sed   u p   t o   5  
 
 
hours.  
 
 
 
Check   w hich   b attery   i s   " in   u se"   b efore   r emoval.     S ee   b attery  
status   i n   c ollection   s oftware   t o   r eplace   b attery   " not   i n   u se".    
See   t he   P ower   o r   B attery   S tatus   I ndicator   s ection   o f   t his   Q uick  
Start   G uide.  
 
Press   b attery   r elease   b utton   t o   o pen   b attery  
compartment   d oor   ( FRONT)  
 
To   r eplace   b attery,   p ull   o r   s lide   b attery   o ut  
and   c lose   t he   c ompartment   d oor  
 
To   c harge   b attery,   p lug   t he   A C   b attery  
charger   i nto   t he   w all   s ocket   a nd   p ower   L ED  
turns   O N  
 
Place   A PS-3   b attery   i n   c harger   f or   2   h ours   o r  
until   L ED   t urns   G REEN   f or   f ull   c harge.   R ED  
 
LED   i ndicates   b attery   n ot   f ully   c harged.  
Flashing   R ED   i ndicates   b attery   f ault.  
To   l oad   b attery   i n   A PS-3,   S lide   t he   b atteries  
in   t he   s lot   a nd   c lose   c ompartment   d oor.    
 
 
5