DLab SK-L330-Pro Panduan Servis - Halaman 5

Jelajahi secara online atau unduh pdf Panduan Servis untuk Peralatan Laboratorium DLab SK-L330-Pro. DLab SK-L330-Pro 11 halaman. Lcd digital shaker

DLab SK-L330-Pro Panduan Servis
PCB etc.; Motor Modules: motor, Counterweight, Support, Eccentric Axis, Bearing, Turnplate etc.;
Rocker Module: Rocker Plate, Rocker Panel, Shrapnel, Bracket etc.; Upper Guard Module: Upper
Guard, LCD PCB, Knob etc.
Power supply: 220/110V → power outlets → PCB → system control power supply
Movement: motor drives Movement Module to rotate. According to a different lock screw
location on Rocker Plate, the movement pattern of shaker is different.
Speed feedback: the motor speed is accurately measured by the Shaft Encoder fixed on the
motor along with photoelectric switch and a feedback is given.
LCD display: LCD PCB is connected to Master Control Board and displays user's settings
and current equipment operation information.

Chapter 2: Removal and Installation of Instrument

When instrument failure occurs, first, you should conduct a failure analysis; if the failure is caused
by the damage of instrument hardware, the related component must be repaired or replaced. Here
are the relevant contents of the replacement and disassembly of instrument.

2.1 Removal

Tool:Cross screwdriver, Diagonal Pliers, Allen key, socket spanner
Step 1:
Turn the instrument upside down,
remove the screws at the red circle
icon;
3