ALUZ A1-ZIBI-STN-DWH Manual - Halaman 6
Jelajahi secara online atau unduh pdf Manual untuk Peralatan Pencahayaan ALUZ A1-ZIBI-STN-DWH. ALUZ A1-ZIBI-STN-DWH 13 halaman.
1
Measure area where luminaire will be installed. Use a laser line
to create a reference along installation area, ensuring accurate
placement of mounting clips. Mark location where each mounting
clip will be installed along reference line.
2
The number of required mounting clips differs for dry and wet
location products. Verify number of mounting clips is appropriate
for installation environment before beginning installation. Do not
install luminaires with inadequate number of mounting clips. Refer
to the Mounting Clips page for additional information.
3
Lay mounting clips along reference line and pre-drill surface using
an appropriate drill bit for surface and screw size.
Recommendation: 8/32 x 1" Screw.
Note: Allow 1/4" clearance for lateral expansion of assembled
mounting clips. Only install mounting clips on flat, even surfaces.
4
If applicable, connect disconnects between segments and push
together, leaving no gap. Use a mounting clip at the junction
between two segments.
5
If applicable, connect jumper cable disconnects between segments.
Install end cap screws to connect end cap to segment.
1170 N Red Gum St, Anaheim, CA 92806
aluz.lighting
© ALUZ All Rights Reserved. ALUZ reserves the right to make changes or withdraw specifi cations without prior notice.
A1 Series | Surface
ZIBI Standard Dynamic White
(A1-ZIBI-STN-DWH)
,
(
)
1.75"
866.ALUZ.LTG | 714.535.7900
6
Screw mounting clips to surface, then snap luminaire into mounting
clips. Install set screws if required. Set screws are required for
downward and outward facing applications.
7
If applicable, connect power cord disconnects to luminaire segment.
Install end cap screws to connect end cap to segment.
Note: Standard luminaire provided with 1 factory installed 6' power
cord and 1 end cap at the end of each run. Power cord is easily
relocated by unscrewing end cap and undoing disconnects.
8
Perform a continuity test before connecting to power source.
Refer to Continuity Test for details.
9
Verify wiring diagram, then connect luminaire to power source.
Dry Location Mounting
6'
Installation Instructions
9 / 11 / 2023 / Rev 4
Page 6 of 13