ALUZ A1-ZUCO-PVT-BIOS Manual - Halaman 5

Jelajahi secara online atau unduh pdf Manual untuk Peralatan Pencahayaan ALUZ A1-ZUCO-PVT-BIOS. ALUZ A1-ZUCO-PVT-BIOS 11 halaman. Surface zuco pivot bios illuminated

1
Measure area where luminaire will be installed. Use a laser line to
create a reference line along installation area, ensuring consistent
alignment of mounting clips. Mark location where each mounting
clip will be installed along reference line.
2
Mark location where mounting clips will be installed.
Note: The number of required mounting clips differs for dry and wet
location products. Verify number of mounting clips is appropriate
for installation environment before installing. Do not install
luminaires with inadequate number of mounting clips.
3
Lay mounting clips along reference line and pre-drill using an
appropriate drill bit for surface and screw size.
Recommendation: 8/32 x 1" countersink screw.
Note: Allow 1/4" clearance for lateral expansion of assembled
mounting clips. Only install mounting clips on flat, even surfaces.
4
Each luminaire segment has a male and female end used for
continuous connections. Lay out each segment next to the
mounting clips where they will be installed. Position the segments
as follows: power lead end, female end, male end, and so on.
5
Ensure segments are aligned with mounting clips per the mounting
diagrams. Make any necessary adjustments to mounting clip
positions, then screw mounting clips to surface.
Note: Allow 1/4" clearance on each side of mounting clip to account for
lateral expansion. Only install mounting clips on flat, even surfaces.
6
Snap luminaire segments into mounting clips. Position each
segment end with a continuous connection end halfway across the
mounting clip.
1170 N Red Gum St, Anaheim, CA 92806
aluz.lighting
© ALUZ All Rights Reserved. ALUZ reserves the right to make changes or withdraw specifi cations without prior notice.
A1 Series | Surface
ZUCO Pivot BIOS Illuminated
(A1-ZUCO-PVT-BIOS)
866.ALUZ.LTG | 714.535.7900
7
Snap the next segment into mounting clips, then slide towards the
previously mounted segment. Ensure female and male pins are
aligned before applying force. Push segments together until they fi t
snugly with no gaps.
8
Continue mounting and connecting segments until entire run has
been mounted.
9
Perform a continuity test before connecting to power source.
Refer to Continuity Test for details.
10
If applicable, install End Caps at the end of each run. Feed the
power lead through end cap exit and connect to power source.
Page 5 of 11
Dry Location Mounting
Installation Instructions
8 / 9 / 2023 / Rev 0