DockCraft CR 100 Manual - Halaman 14

Jelajahi secara online atau unduh pdf Manual untuk Peralatan Perahu DockCraft CR 100. DockCraft CR 100 15 halaman.

Wood Dock with Decking Flush with Side Board
Wood Decking Support
Ideal for situations when the
underside of your Dock is not
accessible
Wood Decking Flush with Aluminum Side Channel
Aluminum Decking Support
Wood Decking – Pipe Dock
Location #2 - 5 inches
Location #1 - 2 1/4 inches
Hardware
- Standard Hardware
- 1/4 x 2 ½ inch Stainless Steel lag Screw – location #1, not included
- ¼ inch Stainless Steel washer, each location
Installation Requirements
•Standard Installation; except
•Location #1, Drill 1/8 or 3/16 inch pilot hole through decking and
into the wood decking support.
•Insert Lag Screw and washers to secure.
Location #2 - 5 inches
Location #1 - 2 1/4 inches
Hardware
- Standard Hardware
- 1/4 x 2 ½ inch Stainless Steel Cap Screw – location #1, included
- ¼ inch Stainless Steel washer, each location, included
- ¼ - 20 inch Stainless Steel nut and lock washer, not included
Installation Requirements
•Standard Installation; except
•Location #1, Drill 3/8 inch hole through decking and aluminum
decking support.
•Insert Cap Screw , washer , and lock washer and nut to secure.
Location #2 - 5 inches
Location #1 - 2 1/4 inches
Hardware
-
1/4 x 2 ½ inch Stainless Steel lag Screw – location #1 & 2, not
included
- ¼ inch Stainless Steel washer, each location
Installation Requirements
•Location #1 & 2, Drill 1/8 or 3/16 inch pilot hole through decking and
into the wood decking support.
•Insert Lag Screws and washers to secure.
Page 14 of 15