Docking Drawer 161100 Instal Manual - Halaman 5
Jelajahi secara online atau unduh pdf Instal Manual untuk Pengisi Daya Baterai Docking Drawer 161100. Docking Drawer 161100 5 halaman.
Reinstalling the Outlet–
Install the AC/USB charging outlet in the receptacle
box before plugging in the Docking Drawer.
• A fterthereceptacleboxhasbeencorrectlyinstalledinthe
REMINDER: IF THE CABLE ARM GROUND WIRE WAS REMOVED DURING
INSTALLATION, MAKE SURE IT HAS BEEN REATTACHED AND TORQUED
PROPERLY. MAKE SURE THE CIRCUIT BREAKER IS WIRED IN SERIES WITH
THE LINE (BLACK) WIRE AS SHOWN IN THE WIRING DIAGRAM.
• F ollowtheAC/USBchargingoutletinstructions(includedinoutletpackaging)
andconnecttheblack,white,andgreenwiresinaccordancewiththose
instructions.
Specifications–
DockingDrawer
TechnicalSpecifications:
™
• ACPower:125V,tamperresistantNEMA5-15Rduplexreceptacle.
• D C(USB)Power:5.2V,12.5WduplexUSBcharging r eceptaclewith
integrated o n/offsafetyswitch.
• M axratedcurrent@125VAC:3A.Circuitisprotectedby5Apop o ut
breakeraccessiblefromtheuserside.Designedforchargingpersonal
electronicdevicesonly.
Wiring Diagrams–
Operation–
• I nstructionsspecifictotheUSBchargingoutletare
includedwiththeoutletitself.
• T heDockingDrawerincludesa5Aresettablecircuit
breaker.Breakertripisindicatedbythewhitebutton
protrudingapproximately3/8"outfromthehousing.
Toreset,correctthesourceofovercurrentandpush
thewhitebuttonbackin.
backofthedrawerand(ifapplicable)allwirescorrectly
reattached,theAC/USBchargingoutletcanbeinstalled.
Receptacle Box Wiring
Green Wire (ground):
green screw
White Wire (neutral):
silver screw
Black Wire (line):
brass screw
5