Dolomite Mitos Panduan Memulai Cepat - Halaman 2
Jelajahi secara online atau unduh pdf Panduan Memulai Cepat untuk Pompa Air Dolomite Mitos. Dolomite Mitos 3 halaman. Automated product collector
Juga untuk Dolomite Mitos: Manual Petunjuk Pemrograman (15 halaman)
![Dolomite Mitos Panduan Memulai Cepat](/uploads/products/server2/977479/977479.jpg)
Figure 3: 3-Way Valve on the Collector X-Y Arm
4
• Ensure that there is an appropriate
container to collect the waste
material.
• Connect the Power Supply cable to
the rear of the unit (Figure 4).
Figure 5: Vial Rack
3
Configure the 3-Way Valve on the
X-Y arm of the Automated Product
Collector - Fluidic Inlet (from chip/
system), Waste Outlet and Collection
(to vial) tubing should be connected
(Figure 3). The supplied calibrated
tubing pack will have labelled tubing
for these locations.
5
Insert the appropriate Rack (Figure
5) into the Automated Collector Sam-
ple Tray (smaller racks may require a
rack adaptor).
Figure 4: Power and Communications Ports