Aktek TB2WE Manuale d'uso - Pagina 12

Sfoglia online o scarica il pdf Manuale d'uso per Strumenti di misura Aktek TB2WE. Aktek TB2WE 18. Turbine flowmeter

Aktek TB2WE Manuale d'uso

3.1.1TB3WE Three-Wire System Electric Wiring

1.Main power supply and output signal terminals
(3-digit under-hang spinning terminals in the left).
Fout
Fout:Pulse Signal Output Terminal
"-"is the power supply "-" or current flow terminal
"+"is external 12-24VDC power "+"
When "+" "-"connect (or battery type power on),pulse output from "Fout".
2.Auxiliary Wire(small terminal)
The three-wire between main terminal and auxiliary terminal are pulse output switch.
If insert into the outside F0,there will be pulse output.
If insert into the inside NC,then no pulse output.
For two wire current type,only insert outside F0 while testing.
If use current,must insert inside NC to disconnect pulse output. Or else,the current
will not be accuracy.
3.Battery Powered Type
+3V6
3V6-
1).Battery Wiring(the right side 1 and 2 in small terminal)
+3V6: Connect 3.6V battery "+"
3V6-: Connect 3.6V battery "-"
2)Communication Wiring
(the left side 3 and 4 in small terminal, if without RS485,no terminal here)
B-:Connect RS485 "B-"
A+:Connect RS485"A+"

3.1.2 TB2WE Three-Wire System Electric Wiring

1.Main power supply and output signal terminals
Fout
AKTEK Endüstriyel Ekipman ve Enstrümantasyon LTD.ŞTİ.
İMES Sanayi Sitesi B-Blok 204.Sok. No:40 Y.Dudullu-Ümraniye/İSTANBUL
-
+
B-
-
+
10
A+
www.aktek.com.tr