Ekinex EK-CD2-TP Manuale di avvio rapido - Pagina 3

Sfoglia online o scarica il pdf Manuale di avvio rapido per Apparecchiature di registrazione Ekinex EK-CD2-TP. Ekinex EK-CD2-TP 4.

Connection of outputs (low-consumption LEDs)
Block
Mark
6
+ 5V
7
OUT1
8
OUT2
9
OUT3
10
OUT4
*) not present in the EK-CC2-TP version
Warning! The electrical connection of the device
!
can be carried out only by qualified personnel. The
incorrect installation may result in electric shock or
fire. Before making the electrical connections, make
sure the power supply has been turned off.
Mounting
The device has degree of protection IP20, and is therefo-
re suitable for use in dry interior rooms. The support EK-
SMG-35 allows the mounting on 35 mm rail in boards or ca-
binets for electrical distribution.
a) Insert the mounting support into the appropriate shaped profile of the
interface
b) Place the support clamping tooth on the top edge of the mounting
rail and rotate device and support towards the guide until it completely
engages
c) Once fastened, connect the bus line, the inputs and the outputs
Connection
LED power supply
Output LED 1
Output LED 2
Output LED 3 *
Output LED 4 *
Configuration and commissioning
Configuration and commissioning of the device re-
quire the use of the ETS
program V4 2.0 or later releases. These activities must
be carried out according to the design of the building au-
tomation system done by a qualified planner.
i
Note. The configuration and commissioning of KNX
devices require specialized skills. To acquire these
skills, you should attend the workshops at KNX cer-
tified training centers.
Configuration
For the configuration of the device parameters the corre-
sponding application program or the whole ekinex
duct database must be loaded in the ETS program. For
detailed information on configuration options, refer to the
application manual of the device available on the website
www.ekinex.com.
Application
Product
software
code
(## = release)
EK-CC2-TP
APEKCC2TP##.knxprod
EK-CD2-TP
APEKCD2TP##.knxprod
EK-CG2-TP
APEKCG2TP##.knxprod
Commissioning
For commissioning the device the following activities are
required:
• make the electrical connections as described above;
• turn on the bus power supply;
• switch the device operation to the programming mode
by pressing the programming pushbutton located on
the front side of the housing. In this mode of operation,
the programming LED is turned on;
• download into the device the physical address and the
configuration with the ETS
At the end of the download the operation of the device
automatically returns to normal mode; in this mode the
programming LED is turned off. Now the bus device is
programmed and ready for use.
Reset of the device
To reset the device remove the bus connection by ex-
tracting the bus terminal from its seat. Keeping pressed
the programming pushbutton, reinsert the bus terminal in
his seat; the programming LED blinks fast. Release the
programming button and remove the bus terminal again;
the reset was carried out. Now you need to address and
configure again the device via ETS.
!
Warning! The reset restores the device back to the
state of delivery from the factory. The address and
the value of the parameters set during configuration
will be lost.
Marks
• KNX
• CE: the device complies with the Low Voltage Directi-
ve (2014/35/EU) and the Electromagnetic Compatibili-
ty Directive (2014/30/EU). Tests carried out according
to EN 50491-5-1:2010 and EN 50491-5-2:2010
Maintenance
The device is maintenance-free. To clean use a dry cloth.
It must be avoided the use of solvents or other aggressive
substances.
3
(Engineering Tool Software)
®
®
Comm.
Group
objects
adresses
(max nr.)
(max nr.)
93
255
93
255
365
365
program.
®
pro-