Donovan Hammer II Manuale d'uso - Pagina 13
Sfoglia online o scarica il pdf Manuale d'uso per Apparecchiature industriali Donovan Hammer II. Donovan Hammer II 20. Arm system for belly dumps, end dumps, dump bodies & pups
P/N 1809533 Rev. B
STEP 5: Lay front edge of tarp across tarp axle and center
tarp with box (cab guard may be off center). Start at
center and work toward edges, pulling tarp tight.
Option 1 (Recommended) - Thread front of tarp with plastic
rod into slot in center of roller bar. Trim ends of rod to fit tarp.
plastic rod on
front of tarp
slot in roller bar
Option 2 - Fasten screws
through washers and grom-
mets into threaded groove.
Hardware not included.
1
option
screw
washer
tarp
grommet
Option 3 - Install nuts into axle
groove, fasten screws through
washers, grommets and nuts.
Hardware not included.
2
option
screw
washer
tarp
grommet
nut
Tarp must wind open in direction
shown. To prevent debris from
entering tarp axle, position tarp
to roll open off top of axle toward
rear of box.
Tarp Tube Assembly & Tarp Installation - continued
STEP 6: Position tarp arms at top rear of box. Square up tarp
tube with box by adjusting distance where tarp tube
enters arms.
NOTE: First, insert tarp tube as far as possible into tarp arms.
Pull ends of tarp tube slightly out of each arm as needed to
align tarp tube squarely across box.
STEP 7: Drill 5/16" hole through both arms approximately 3"
lower on lower arm. Attach with cap screw
washer
NOTE: Maintain minimum 18" inset when cutting upper arm
down to length.
5/16"
drill
tarp arm
and lock nut
.
P
L
3"
C
hole
P
L
18"
tarp tube
rear
of box
, flat
C
10