Akw 01410MG Istruzioni per l'installazione - Pagina 2

Sfoglia online o scarica il pdf Istruzioni per l'installazione per Aiuto per il bagno Akw 01410MG. Akw 01410MG 4. Plastic grab rails

Important Information & Installation
Installation must be carried out in accordance with these instructions, and must be
conducted by a competent installer.
Important
Before fixing anything to the walls, ensure that the construction of that wall type is capable of
the maximum weight of the loaded unit and that the appropriate fixings and fixtures are used
for that wall type. Wall fixings are not supplied.
It is recommended to use all fixing holes on the bracket. Do not use countersunk screw fixings.
Before you start
Please remove any protective covering and examine carefully. Check that all items are present
before discarding of all packaging. Please notify the retailer immediately of any damage
or faults. The manufacturer cannot be held responsible for any installation costs that may
arise from damaged or faulty products being installed and not in accordance with these
instructions. Keep small parts and packaging away from children and dispose all packaging in
accordance with the local recycling authorities.
for grab rails with two wall brackets please follow the instructions below:
Hold the grab rail in position ensuring that it is level
remove bracket covers.
& mark the position of the holes.
Check for pipes or cables before drilling. Drill & secure
Do not overtighten wall fixings.
in place using the appropriate tools and wall fixings.
secure bracket covers in place.
2
General: 01905 823 298
|
www.akw-ltd.co.uk