DAEHAN BAR S Series Manuale d'uso - Pagina 2
Sfoglia online o scarica il pdf Manuale d'uso per Luce di lavoro DAEHAN BAR S Series. DAEHAN BAR S Series 4. Super bright s-led module
User Guide
PREPARATION
LAYOUT DENSITY
GUIDELINES
WIRING GUIDE
BAR S Series
TOOLS REQUIRED
Wire Stripper, Drill, Screw Driver, Wiper
PREPARE CHANNELS
1. Clean moisture and dust inside
1. Wipe out dust, water, and oil inside. 3M tape will come off easily if product is mounted on uncleaned surfaces.
2. Make holes for wires from modules to SMPS.
3. Without bushins, wires will easily be cut and short-circuit will occur.
*Use white paint inside the channels for better reflection
Use recommended length for pitch between each module to achieve optimum lighting output while maintaining lowest unit
cost. Failure or misplacing will cause dimmed spots or uneven appearance of light on the surface.
In case of showcase
FRONT VIEW
AC Input
Power Supply
DC Output
1M
2M
5M
DAEHANTRANS CO.,LTD
#7-11 Songdo-Dong, Yeonsu-Gu, Incheon, Korea
Tel. +82 32 858 0491 Fax. +82 32 832 8421 [email protected] / www.daehantrans.com
SUPPLIES REQUIRED
Wire Nuts, Cable Ties, IDC Connectors, VCTF(PLTC) Cable,
(Optional : Silicon and Screws)
2. Make holes
Make sure that each run should have 50 M at max
and should use another run in parallel to connect more
Should use thicker wires which can take larger amount of current
than the amount transmitted from the power supply unit
1M
1M
2M
2M
5M
5M
3. Use bushing to protect wires
SIDE VIEW
1M
2M
5M
2