Debris left in pipework will cause
significant damage to the pump and will
void the warranty.
Foreign matter
entering the pumps
inlet will cause
serious damage
Due care must be used when handling
the pump. Failure to do so may result in
serious personal injury or property
damage.
Follow all lifting
codes and do not
drop the pump
3.1

INTRODUCTION

Ebsray pumps must only be installed in systems designed
by qualified competent engineering personnel. System
design must conform to all applicable regulations and
codes and provide warning of all system hazards.
This installation must be performed by qualified,
competent personnel and they must, completely
read/review this entire document prior to starting any
work. If any part of this publication is unclear, obtain
clarification before proceeding with any work.
These instructions are additional to, and do not supersede
or override any applicable statutory, legal or regulatory
requirements.
New pumps contain residual test fluid and rust inhibitor. If
necessary, flush pump prior to use.
The design, materials and workmanship incorporated in the
manufacture of Ebsray pumps make them capable of reliable
operation over a long working life. Correct installation is
essential to ensure a long service life.
When the equipment supplied utilises components other than
those manufactured by Ebsray (e.g. electrical equipment,
switches, fittings or valves), refer to the original manufacturer's
data before installation or servicing is commenced. Failure to
observe these details may void the Warranty.
3.2

WARRANTY

All Ebsray manufactured pumps and equipment are warranted as
standard for one (1) year against faulty workmanship and/or
materials. Refer to Ebsray pumps for details.
Ancillary equipment supplied by Ebsray but manufactured by
others are not covered under Ebsray's warranty.

SECTION 3 - INSTALLATION

NOTE:
NOTE:
NOTE:
NOTE:
Foreign matter entering the pump WILL
cause serious damage to the pump
Flush tank and
supply piping prior
to installing pump
3.3
TRANSPORTATION, HANDLING & INSPECTION
Standard domestic packing is suitable for shipment in covered
transports. When received, inspect the pump/pumpset against
dispatch documentation and for damage.
Any damage or shortage incurred during transit should be noted
on the packing note and on both your own and the carrier's copy
of the consignment note.
Should a shortage be evident on receipt, notify Ebsray
immediately giving full details and packing note number.
Additionally a claim should be made with the transport company.
When received on site the pump set must be stored in a dry
covered area.
Never allow water or any corrosive product to enter the
pump. Hydrostatic testing of pipework with pump installed
may void the Warranty.
If the pump/pumpset is not installed and commissioned
immediately or has been removed from service, then the pump
internals should be filled or thoroughly flushed with a light rust
inhibiting hydrocarbon fluid, In addition to this pump ports must
be sealed to exclude ingress of condensation, moisture or foreign
material.
3.4
PUMP LOCATION & PIPING CONNECTIONS
The R75 pump is designed to flange mount directly or remotely
to a commercial internal control valve in combination with the
tank of a bobtail truck or transport.
Pump life and performance will be significantly reduced when
installed in an improperly designed system. Before starting the
layout and installation of the piping system, review the
following:
1. When locating the pump, safety MUST be the first
consideration.
2. The discharge hose and fittings should be large enough
to minimize the pressure drop in the system. The lower
the friction loss, the higher the flow rate.
All piping and fittings MUST be properly supported to
3.
prevent any piping loads from being placed on the pump.
3