Dover HydroSystems Superdos 15 0.3 Manuale operativo - Pagina 11
Sfoglia online o scarica il pdf Manuale operativo per Pompa dell'acqua Dover HydroSystems Superdos 15 0.3. Dover HydroSystems Superdos 15 0.3 20.
Routine Maintenance Instructions
Step 1.
Unscrew LOWER END
CYLINDER ASSEMBLY from
body. Remove LOWER END
CYLINDER ASSEMBLY.
Step 4. For 2.5% & 5%
Replace #44 DOSAGE PISTON
flared-end up and #14 O-ring.
0.3% only: Replace #51 SHAFT
ASSEMBLY. See Step 5a.
Step 6.
Reinsert #15 SEAL RETAINER
and #17 O-ring onto #51
SHAFT ASSEMBLY.
Step 2.
Rotate #51 SHAFT 90º
and pull from body.
Step 5. For 2.5% WSP
Pinch and pull #44 DOSAGE
GASKET over the retainer lip.
Slide off the #51 shaft assembly.
Step 7.
Reinsert #51 SHAFT ASSEMBLY
into body and rotate 90º to lock.
Confirm the shaft is locked in by
gently tugging on the shaft. Shaft
should remain inserted.
Step 3.
Pry the #15 SEAL RETAINER from
the injector. Pry #17 O-ring from
the unit. NOTE: O-ring may still
be seated at the base of the unit.
Step 5a. For 0.3%.
Replace LOWER SHAFT
assembly into upper shaft.
Step 8.
Screw LOWER END CYLINDER
ASSEMBLY onto body. Ensure
#16 GASKET is seated on the
top of cylinder assembly.
11