Dover HydroSystems Superdos 15 5 Manuale operativo - Pagina 11
Sfoglia online o scarica il pdf Manuale operativo per Pompa dell'acqua Dover HydroSystems Superdos 15 5. Dover HydroSystems Superdos 15 5 20.
Routine Maintenance Instructions
Step 1.
Unscrew LOWER END
CYLINDER ASSEMBLY from
body. Remove LOWER END
CYLINDER ASSEMBLY.
Step 4. For 2.5% & 5%
Replace #44 DOSAGE PISTON
flared-end up and #14 O-ring.
0.3% only: Replace #51 SHAFT
ASSEMBLY. See Step 5a.
Step 6.
Reinsert #15 SEAL RETAINER
and #17 O-ring onto #51
SHAFT ASSEMBLY.
Step 2.
Rotate #51 SHAFT 90º
and pull from body.
Step 5. For 2.5% WSP
Pinch and pull #44 DOSAGE
GASKET over the retainer lip.
Slide off the #51 shaft assembly.
Step 7.
Reinsert #51 SHAFT ASSEMBLY
into body and rotate 90º to lock.
Confirm the shaft is locked in by
gently tugging on the shaft. Shaft
should remain inserted.
Step 3.
Pry the #15 SEAL RETAINER from
the injector. Pry #17 O-ring from
the unit. NOTE: O-ring may still
be seated at the base of the unit.
Step 5a. For 0.3%.
Replace LOWER SHAFT
assembly into upper shaft.
Step 8.
Screw LOWER END CYLINDER
ASSEMBLY onto body. Ensure
#16 GASKET is seated on the
top of cylinder assembly.
11