Dover PSG ALL-FLO IOM A025 Series Installazione Dati di funzionamento e manutenzione - Pagina 12
Sfoglia online o scarica il pdf Installazione Dati di funzionamento e manutenzione per Pompa dell'acqua Dover PSG ALL-FLO IOM A025 Series. Dover PSG ALL-FLO IOM A025 Series 20. Plastic 1/2 inch air-operated double-diaphragm pump
REPAIR AND ASSEMBLY
SUBMERSION-MUFFLER KIT INSTALLATION
TOOLS NEEDED
1)
/
Inch socket
1
4
2)
/
Inch socket wrench
1
4
STEP 1
Place "Submersion/Muffler Plate Gasket" onto back
of intermediate and line up screw holes.
ALF-11010-E-02
WARNING
Prior to servicing the pump, ensure that the air
and fluid lines are closed and disconnected. While wearing personal
protective equipment, flush and drain process liquid from the
pump in a safe manner.
WARNING
Maintenance must not be performed when a hazardous atmo-
sphere is present.
STEP 2
Place "Submersion/
Muffler Plate" onto
"Submersion/Muffler
Plate Gasket" and line
up screw holes.
12
SECTION
STEP 3
Insert screws into screw holes.
Tighten screws using a
socket and socket wrench
(recommended),
/
" wrench, or
1
4
flathead screw driver.
7
/
"
1
4
All-Flo