Follett HCD710ABT Manuale di istruzioni per l'installazione - Pagina 6
Sfoglia online o scarica il pdf Manuale di istruzioni per l'installazione per Fabbricatore di ghiaccio Follett HCD710ABT. Follett HCD710ABT 12. To ice storage bin top-mount applications
Anche per Follett HCD710ABT: Manuale di avvio rapido (8 pagine)
3.
Louvered Docking Assembly Installation
§ Prior to installing the louvered docking assembly, ensure that the drain fitting is oriented (right or left) correctly
for your installation. An optional straight drain fitting is also supplied. You may need to remove the back panel
of the docking assembly in order to re-orient or change the drain fitting. Replace back panel prior to mounting
the docking assembly.
§ Docking station must be secured in accordance with these instructions to ensure ice machine stability.
§ Ventilation openings in the louvered docking station should be clear of obstruction. Failure to do so could
result in damage to equipment.
§ Plug must be accessible after final installation.
§ Remove protective tape from gaskets
§ Mount louvered docking assembly using two screws
provided.
6
WARNING!
.
Horizon 710/1010/1410
§ Apply gaskets
➊
.
§ Install shuttle actuator
and secure with locking nut
➋
through dispenser top
➌
.
BIN • TOP-MOUNT